report
Test run for the HRMT-15 (RPINST) experiment
2012
The present document discusses the results of the measurements carried out during the test run performed before the main beam time of the HRMT-15 (RPINST) experiment in the HiRadMat facility, which is planned for October 2012. A prototype detector, specifically designed for measuring pulsed neutron fields, was employed in different positions in order to evaluate the stray neutron field conditions in the TA7 tunnel of HiRadMat. Critical points to be taken into account for the main experiment in October are presented, along with solutions to overcome them.
Type
report
Author(s)
Date Issued
2012
Publisher
CERN EDMS System
Total of pages
9
Written at
OTHER
EPFL units
Available on Infoscience
September 21, 2012
Use this identifier to reference this record