  4. Kariba plunge pool rehabilitation
 
conference paper

Kariba plunge pool rehabilitation

Stojnic, Ivan  
•
Ylla Arbos, Claudia  
•
Amini, Azin  
Show more
2018
Proceedings of HYDRO 2018
HYDRO 2018

The Kariba Dam is a 128 m high arch dam located on the Zambezi River, between Zambia and Zimbabwe. It forms the Kariba lake, with a surface of 5400 km2 and a capacity of 185 km3. In the 20 years following dam construction, heavy rainfalls required frequent spilling operations at high discharges. Excess water from the upstream reservoir is conveyed to the downstream river through six gated spillways with a section of 9.1 m in height and 8.8 in width, which generate free-falling jets with high impact velocities of around 21 m/s. Intensive operation of the spillways progressively scoured a deep and steep-sided hole with its current bottom at about 70-80 m below the original riverbed and about 80-90 m below the normal tailwater level. Between 2010 and 2012, a comprehensive study including both physical and numerical modeling was carried out to investigate the plunge pool situation, with the aim to assess and control any potential future scour development (LCH/AVE Report 04/12). The results of the study indicated unacceptable scour evolution, and therefore several countermeasures were proposed and tested. The study concluded that plunge pool geometry reshaping in the downstream direction was both an efficient and technically plausible solution to limit future erosion. Different reshaping geometries were tested, and based on pressure and velocity measurements at selected locations, a final configuration of the plunge pool was proposed. In order to perform the necessary excavation works for plunge pool reshaping, a cofferdam is foreseen downstream of the pool. Furthermore, a major geological fault will be treated during excavation by means of a concrete structure. The objectives of the present study are i) to validate the design of the cofferdam; ii) to assess dam safety if only partial excavation of the plunge pool is carried out; iii) to investigate the role of the cofferdam in energy dissipation, and iv) to identify relevant hydrodynamic loads for the design of the fault treatment structure.

  • Files
  • Details
  • Metrics
Type
conference paper
Author(s)
Stojnic, Ivan  
Ylla Arbos, Claudia  
Amini, Azin  
De Cesare, Giovanni  
Schleiss, Anton  
Date Issued

2018

Published in
Proceedings of HYDRO 2018
Total of pages

8

Volume

1

Issue

22.01

Note

[1250]

Editorial or Peer reviewed

REVIEWED

Written at

EPFL

EPFL units
PL-LCH  
Event nameEvent placeEvent date
HYDRO 2018

Gdansk, Poland

October 15-17

Use this identifier to reference this record
https://infoscience.epfl.ch/handle/20.500.14299/149666
Logo EPFL, École polytechnique fédérale de Lausanne
  • Contact
  • infoscience@epfl.ch

  • Follow us on Facebook
  • Follow us on Instagram
  • Follow us on LinkedIn
  • Follow us on X
  • Follow us on Youtube
AccessibilityLegal noticePrivacy policyCookie settingsEnd User AgreementGet helpFeedback

Infoscience is a service managed and provided by the Library and IT Services of EPFL. © EPFL, tous droits réservés