Loading...
research article
Non-evaporable getter pump operations in the TCV tokamak
April 1, 2021
A non-evaporable getter pump using the ZAO alloy was installed on TCV and operated during the 2019 experimental campaign. The pump performance, determined from in-situ pumping speed measurements, indicates that current getter pump technologies are well suited to tokamak operations with high power exhaust plasmas, and provide an interesting alternative for applications in fusion experiments.
Loading...
Name
NEG_in_TCV.pdf
Type
Postprint
Access type
openaccess
License Condition
n/a
Size
580.61 KB
Format
Adobe PDF
Checksum (MD5)
23e4ee83d0d03d844720d13a94bd0a2f