Repository logo

Infoscience

  • English
  • French
Log In
Logo EPFL, École polytechnique fédérale de Lausanne

Infoscience

  • English
  • French
Log In
  1. Home
  2. Academic and Research Output
  3. Conferences, Workshops, Symposiums, and Seminars
  4. Towards Automatic Train Operation for long distance services: State-of-the art and challenges
 
conference paper not in proceedings

Towards Automatic Train Operation for long distance services: State-of-the art and challenges

Emery, Daniel  
2017
17th Swiss Transport Research Conference

The Automatic Train Operation of a metro line is not so difficult to implement: almost no junction or crossing between lines, rolling stock homogeneity, double track operation, relatively low speed, very simple station track layout, mostly rubber-mounted, and specific site continuously fenced with no level crossing. Tunnels and platform screen doors complete the picture to prevent almost totally the presence of an obstacle or a person on the tracks. But how can Automatic Train Operation for a metro line be transposed into a long distance train line or further into a country wide network? This paper reminds firstly the different Grades of Automation. Then, it shows Automatic Train Operation used in conjunction with the Communication Based Traffic Control that drives Automatic Train Operation of a metro line. Some information about Automatic or Automatic-like Train Operation Systems are also given in a traditional rail network context and what it is possible to do right now. Finally, the paper presents some alternatives to face challenges met in a Semi-Automatic Train Operation context and in an Unattended Train Operation context. To resume, the actual use of the Packet 44 of the European Train Control System is sufficient for Semi-Automatic Train Operations. Nevertheless, a speed information should complete the actual definition of timings points to obtain a more efficient Automatic Train Operation system. Unattended Train Operation is thinkable in the future, namely with the help of video/infrared cameras in front of the train. Images processing and remote control will then deal with risks and degraded situations.

  • Files
  • Details
  • Metrics
Loading...
Thumbnail Image
Name

STRC17_ATO_Main_Lines_Emery.pdf

Type

Publisher's Version

Version

http://purl.org/coar/version/c_970fb48d4fbd8a85

Access type

openaccess

Size

447.58 KB

Format

Adobe PDF

Checksum (MD5)

d9064ce164edd84dc05886c97411a100

Loading...
Thumbnail Image
Name

STRC_2017_ATO_Presentation_Final.pdf

Access type

openaccess

Size

2.6 MB

Format

Adobe PDF

Checksum (MD5)

772e72c0b108dd9e18f4920341d6af45

Logo EPFL, École polytechnique fédérale de Lausanne
  • Contact
  • infoscience@epfl.ch

  • Follow us on Facebook
  • Follow us on Instagram
  • Follow us on LinkedIn
  • Follow us on X
  • Follow us on Youtube
AccessibilityLegal noticePrivacy policyCookie settingsEnd User AgreementGet helpFeedback

Infoscience is a service managed and provided by the Library and IT Services of EPFL. © EPFL, tous droits réservés