Start-up of a Varspeed Group in Pump Mode, Practical Implementations and Tests

The present paper addresses the practical implementation in a test bench of different control strategies for the start-up of a varspeed group in pump mode. In varspeed groups using a double-fed induction machine supplied by back to back voltage source inverters (VSI), the possibility exists of using the rotor side VSI to start up the group. The current paper focuses on the start-up strategy and its implementation in a test bench of 3.3 kVA. After presenting the hardware composing the test bench, two different start-up strategies are detailed, which are the field oriented control and critical torque. Those two strategies are then implemented in practice, tested, measured and compared.


Publié dans:
2016 XXII International Conference On Electrical Machines (ICEM), 1201-1207
Présenté à:
22nd International Conference on Electrical Machines (ICEM)
Année
2016
Publisher:
New York, IEEE
Mots-clefs:
Laboratoires:




 Notice créée le 2017-02-17, modifiée le 2019-08-12

n/a:
Télécharger le document
PDF

Évaluer ce document:

Rate this document:
1
2
3
 
(Pas encore évalué)