Active control for mid-span connection of a deployable tensegrity footbridge

Tensegrity structures are spatial self-stressed pin jointed structures where compression components (struts) are surrounded by tension elements. This paper describes a near full-scale deployable tensegrity footbridge that deploys from both sides and connects at mid-span. Two topologies that differ in terms of symmetry of elements and paths of continuous cables are compared. Although both topologies behave similarly with respect to serviceability criteria, there is a significant difference in behavior during deployment. A two-stage control methodology for the connection of both halves of the footbridge is presented. The control methodology determines active cable length changes based on computational control and measurement of the response of the structure during deployment. Both halves are successfully connected at the end of deployment. (C) 2016 Elsevier Ltd. All rights reserved.


Published in:
Engineering Structures, 112, 245-255
Year:
2016
Publisher:
Oxford, Elsevier
ISSN:
0141-0296
Keywords:
Laboratories:


Note: The status of this file is: EPFL only


 Record created 2016-04-01, last modified 2018-03-17

n/a:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)