Loading...
research report
Traffic load generation for the fatigue assessment of the 3rd Bosphorus bridge
2015
This report presents the traffic simulation model for the fatigue life prediction of the stiffening cables and hangers from the 3rd Bosporus bridge in Istanbul, a 2164m long hybrid suspended/stay-cable bridge with a main span of 1408m. Probabilistic models for highway and railway traffic are developed based on traffic data.
Loading...
Name
EPFL209910_Bosporo_traffic.pdf
Type
n/a
Access type
restricted
License Condition
copyright
Size
5.04 MB
Format
Adobe PDF
Checksum (MD5)
d83562e2a54862c4c33c47ce443f584d