Full-scale tests of the AC transmission system to examine the new SPS complexes

In order to improve the transfer capability of the 220-500 kV AC transmission system that forms the power network backbone in the Russian Far East interconnected power system, two new generation system protection schemes complexes were put into operation at the Zeya and Bureya hydro power plants. Putting into operation was accompanied by the series of full-scale tests. The peculiarities of the full-scale experiments were participation of the experts from Russia, Switzerland, Italy and the USA, and implementation of diverse phasor measurement units devices and digital fault recorders produced in different countries such as the USA, Sweden, Belgium and Russia


Published in:
The 8th IEE International Conference on AC and DC Power Transmission (ACDC 2006), 4 - 8
Year:
2006
Keywords:
Note:
AC transmission system;transfer capability;power network;Russian Far East interconnected power system;generation system protection;hydro power plants;phasor measurement;power system stability;digital fault recorder;220 to 500 kV;
Laboratories:




 Record created 2007-04-04, last modified 2018-03-18


Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)