Glardon, RémyGauthey, Matthias2010-10-292010-10-292010-10-292008https://infoscience.epfl.ch/handle/20.500.14299/56461DesignLead time reductionAlternativesDesign and critical analysis of configuration alternatives for reduction of order fulfillment lead-time at Plainsboro, NJ, USA production site.student work::master thesis