Ronden, D. M. S.De Baar, M.Chavan, R.Elzendoorn, B. S. Q.Goodman, T.Heemskerk, C. J. M.Henderson, M. A.Koning, J. F.Saibene, G.Spaeh, P.Strauss, D.2012-05-042012-05-042012-05-04201110.1016/j.fusengdes.2011.02.027https://infoscience.epfl.ch/handle/20.500.14299/80089WOS:000297426500115The present design of the ECH (Electron Cyclotron Heating) upper port launcher has been evaluated in light of the ITER remote handling (RH) requirements. Changes to the launcher design associated with the accessibility, maintainability and manageability of replaceable components are presented.enIterEchUpper port launcherRemote handlingThe ITER EC H&CD upper launcher: Analysis of remote handling compatibilitytext::conference output::conference proceedings::conference paper