Manufacturing and Tests of the European 1 MW, 170 GHz CW Gyrotron Prototype for ITER

An industrial 1 MW, 170 GHz continuous-wave (CW) gyrotron prototype has been manufactured in 2015 at Thales. The physical design is provided by the European GYrotron Consortium (EGYC) and is supported by the construction and the measurement of a modular short-pulse (SP) prototype. In this presentation, the latest experimental results are discussed, with respect to the previous results acquired for the modular SP prototype gyrotron.


Published in:
2016 IEEE International Vacuum Electronics Conference (Ivec)
Presented at:
17th IEEE International Vacuum Electronics Conference (IVEC), Monterey, CA, APR 19-21, 2016
Year:
2016
Publisher:
New York, IEEE
Keywords:
Laboratories:




 Record created 2016-11-21, last modified 2018-09-13


Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)