Abstract

Testing of critical PLC (Programmable Logic Controller) programs remains a challenging task for control system engineers as it can rarely be automated. This paper proposes a model-based approach which uses the BIP (Behavior, Interactions and Priorities) framework to perform automated testing of PLC programs developed with the UNICOS (UNified Industrial COntrol System) framework. This paper defines the translation procedure and rules from UNICOS to BIP which can be fully automated in order to hide the complexity of the underlying model from the control engineers. The approach is illustrated and validated through the study of a water treatment process.

Details

Actions