Abstract

We consider several variants of the job shop problem that is a fundamental and classical problem in scheduling. The currently best approximation algorithms have worse than logarithmic performance guarantee, but the only previously known inapproximability result says that it is NP-hard to approximate job shops within a factor less than 5/4. Closing this big approximability gap is a well-known and long-standing open problem.

Details

Actions