000154108 245__ $$aTest of ITER conductors in SULTAN: an update
000154108 269__ $$a2011
000154108 260__ $$c2011
000154108 336__ $$aConference Papers
000154108 520__ $$aThe ITER Toroidal Field (TF) conductor qualification phase has been carried out by testing short sample prototype conductors in the SULTAN test facility. This phase, started in 2007, has been substantially completed after minor adjustment of the conductor specification and test procedures. All the parties involved in the TF conductor procurement passed the qualification phase. Starting 2010, the samples for TF process qualification phase are tested in SULTAN. A summary of the results for all the ITER Qualification samples and an updated statistics are presented for the V-I and V-T characteristics of the cable-in-conduit conductors (CICC), including Nb3Sn and NbTi samples assembled with either a "bottom joint" or a "U-bend".
000154108 6531_ $$asuperconductivity
000154108 700__ $$0240063$$g113537$$aBruzzone, P.
000154108 700__ $$0240062$$g134508$$aStepanov, B.
000154108 700__ $$0240064$$g106730$$aWesche, R.
000154108 700__ $$aHerzog, R.$$0240133$$g163862
000154108 700__ $$aCalzolaio, C.
000154108 700__ $$aVogel, M.
000154108 7112_ $$dSeptember 27 - October 1, 2010$$cPorto, Portugal$$aSOFT 2010
000154108 773__ $$j86$$tFusion Engineering and Design$$q1406-1409
000154108 909C0 $$pCRPP
000154108 909C0 $$pSPC$$0252028$$xU10136$$xU12267$$xU12269$$xU12271$$xU10559$$xU12273$$xU10557$$xU12270$$xU10137$$xU10636$$xU12266$$xU10635$$xU10558$$xU12268$$xU12272
000154108 909CO $$pconf$$pSB$$ooai:infoscience.tind.io:154108
000154108 917Z8 $$x105759
000154108 917Z8 $$x105759
000154108 917Z8 $$x105317
000154108 917Z8 $$x218840
000154108 937__ $$aEPFL-CONF-154108
000154108 973__ $$rREVIEWED$$sPUBLISHED$$aEPFL
000154108 980__ $$aCONF