Repository logo

Infoscience

  • English
  • French
Log In
Logo EPFL, École polytechnique fédérale de Lausanne

Infoscience

  • English
  • French
Log In
  1. Home
  2. Academic and Research Output
  3. Journal articles
  4. Channel formation during flushing of large shallow reservoirs with different geometries
 
research article

Channel formation during flushing of large shallow reservoirs with different geometries

Kantoush, S. A.  
•
Schleiss, Anton  
2009
Environmental Technology

Depositional and flow patterns are first described to gain an understanding of the erosion patterns during hydraulic flushing in a reservoir. Considering the importance of this issue, two modes of flushing operation for control of sedimentation were performed in several experiments with different reservoir geometries. In order to investigate the effect of flushing and the effectiveness during free and drawdown flows, ten experiments have been conducted. The final bed morphology formed previously was used as the initial bed topography for the two modes of flushing. The entire experiments lasted for two days. Investigations of the flow pattern and the associated bed topography for free flow with normal water depth and drawdown flushing in various shallow reservoir geometries are presented. To effectively apply the flushing processes for the removal of sediment deposits, the location, depth and width of the flushing channel can be changed by modifications to the reservoir geometry. The channel formed during flushing attracts the jet and stabilizes the flow structures over the entire surface. Empirical formulae to describe the relationship between the reservoir geometry and flushing efficiency for the two modes of flushing were developed. Flushing at normal water level allows only a relatively small part of the deposited sediment to be evacuated. As deposits could be flushed out of the basin.

  • Details
  • Metrics
Type
research article
DOI
10.1080/09593330902990162
Web of Science ID

WOS:000267602300011

Author(s)
Kantoush, S. A.  
Schleiss, Anton  
Date Issued

2009

Published in
Environmental Technology
Volume

30

Issue

8

Start page

855

End page

863

Subjects

flushing channel

•

drawdown flushing

•

deposits removal

•

sediment management strategy

•

shallow reservoir geometry

Note

[654]

Editorial or Peer reviewed

REVIEWED

Written at

EPFL

EPFL units
PL-LCH  
Available on Infoscience
July 14, 2009
Use this identifier to reference this record
https://infoscience.epfl.ch/handle/20.500.14299/41314
Logo EPFL, École polytechnique fédérale de Lausanne
  • Contact
  • infoscience@epfl.ch

  • Follow us on Facebook
  • Follow us on Instagram
  • Follow us on LinkedIn
  • Follow us on X
  • Follow us on Youtube
AccessibilityLegal noticePrivacy policyCookie settingsEnd User AgreementGet helpFeedback

Infoscience is a service managed and provided by the Library and IT Services of EPFL. © EPFL, tous droits réservés