Tests and Qualification of the European 1 MW, 170 GHz CW Gyrotron in an ITER relevant configuration at SPC
After an initial testing period at the Karlsruhe Institute of Technology, the upgraded EU 1 MW, 170 GHz continuous wave (CW) industrial prototype gyrotron (TH1509U) for Electron Cyclotron Resonance Heating and Current Drive (ECRH&CD) in ITER has been transferred to the Swiss Plasma Center (SPC) to be tested in an ITER relevant configuration, to reach the performance level required by Fusion for Energy (F4E) to qualify it for the ITER project, and to increase the pulse length to very long pulses.
2022061025_TH1509U_SPC.pdf
Postprint
http://purl.org/coar/version/c_ab4af688f83e57aa
openaccess
CC BY
400.73 KB
Adobe PDF
11a2bcaaae536ecf96458016f161cf3c